The Mom Voice

Everyone knows it, everyone has heard it.  Everyone has felt the power of it. The Mom voice.  It has nothing to do with volume.  It isn’t even determined by sex.  Mothers and fathers both have the Mom voice.  Most of the time the Mom voice is spoken at normal volume, maybe even softer than normal.  The tone and timber are what is used to make the Mom voice so powerful.  It’s a no nonsense tone with such finality in it that makes the recipient cringe in terror.  I used it on my sons when they were growing up.  Nothing made them stop and take notice that I was not fooling around with them, more than the Mom voice.  When used, even the most hardened adult succumbs to it. 

I use the Mom voice on Mitch occasionally.  He hates it.  He would rather I screamed like a fish wife and throw a rant than to look at him and speak to him in the voice.   Mitch has said it makes him feel like a kid again that had just gotten caught with his hand in the cookie jar.  Even the dogs know the Mom voice.  I use it on them when no one will listen and it’s a free for all.  I used it tonight when the wrestling got out of hand with dogs careening off the walls, leaping on and off our bed, totally out of control.  After the Mom voice came out dogs scattered.  AJ laid down by my chair, Charlie and Orso made themselves very scarce, going to lay down in the bedroom.  All is quiet for quite awhile after the Mom voice. 

It’s good to be Mom.

The Great Bathroom Remodel

I can finally see the end of the tunnel.  The walls are all painted, two were even painted twice.  While caulking the tub, the alcohol that Mitch was using to cut the silicone, exploded from the bottle and splashed down two walls.  Guess what?  Alcohol doesn’t wash off.  So he had to re-paint those two walls.  It seems the curse continues.  We finally decided on the granite for the countertop and it’s laying on the floor in the living room to be installed after the final coat of stain dries on the base cabinet. 

We ultimately agreed on shower doors over shower curtains.  That took a long time to find The One, but we did.  That has been installed.  Of course installing a shower door with all of the parts didn’t go as easily as it would for normal people.  Mitch had to make a trip to the hardware store for longer anchors, I guess we have a fat tub.

All that’s left to do is hang the trim around the doors, install the crown molding, hang the upper cabinet, set the granite countertop and tile around the base of the walls to create a baseboard.  Oh, and install the towel bars and the shelving units in the closets.

I’ve thought about taking an inaugural shower, but decided against it because I know what would happen.  If Mitch discovered that we could actually use the bathroom before the total completion, there would never be a total completion.  We would limp along with a half finished bathroom, saying we need to get this done and never do.

I think we might just survive this remodel.  It’s been a tough one.

The Great Bathroom Remodel – Part 752

Well the first coat of paint is finally on the walls, which means that really soon the sinks can go in and the mirrors installed along with the lights above the sinks.  Mitch and Paul applied most of the first coat of paint for me while I was at work.  But they got concerned that the color was too dark and stopped until I got home from work.  I think that they just needed a beer break and paint color was a good excuse.  The color is perfect.  I think they just aren’t used to chocolate milk.  That is what the color is close to.  I showed Mitch that the color is great, by setting one of the cabinet doors next to the wall.  It looked really good.  He still isn’t convinced but he’s hunoring me. 

I’m hoping he’ll fall in love with it after all is said and done, or at least in like with it.

The Great Bathroom Remodel (formerly known as The Gutting of the Bathroom)

So many weeks have passed since we started the Great Bathroom Remodel.  It is now the middle of July and we started in April.  And to think that I was so sure with the two of us on vacation together we could knock out the demolition and renovation in one week, maybe two tops.  Silly me.  You can tell I have never been involved in such a huge undertaking.  I guess I really do live in a fantasy world. 

Demolition is over and rebuilding is underway.  There have been interruptions galore.  One week in the heat to replace the brake lines in the station wagon.  A few days here and there to help friends work on their cars.  Mitch just can’t say no.  Not to mention one huge temper tirade.  I thought that was the end right then and there.

The floor is tiled, the bath tub has been installed and most of the sheetrock has been hung.  Mitch is busy sanding the sheetrock as I write this.  He even has the floor to ceiling medicine closet built.  He wired the lights that will go over mirrors, cut the holes that will hold the mirrors and has plumbed all the water lines and drains for the sinks and tub.

I bought the wall paint and primer and am ready to start as soon as all the sheetrock has been hung and sanded.  The hold up now is the staining of the cabinets.  I had one cabinet stained, but because of the heat and humidity it didn’t turn out well.  The surface of the cabinet doors had dust and grit embedded in the stain.  So we had to bring them inside to the basement where it is much cooler than the garage and re-stain after sanding off all of the gritty stain.  I just love to redo everything I’ve already done.  But even in the basement with the air conditioner running, the stain is slow in drying.  We have to have the one cabinet that will go over the toilet done and in place before he can hang the last of the sheetrock.  I have two cabinets left to stain.  At this rate, I might be done staining by the second coming.

We decided on recessed lighting but haven’t found any we like yet  We haven’t picked out the counter top for the floor cabinet.  We haven’t even gone to look at anything yet.  And there’s the matter of the shower door / curtain.  We can’t decide which way to go.  Shower door or shower curtain.  Any suggestions? 

We’re still married, though at times it’s been close.

The Gutting of the Bathroom – Day I’ve Forgotten

We are now into a month without the master bath.  Things are progressing slowly to say the least.  Mitch has tiled the floor and it looks really good.  He does good work.  We decided that the best course of action on the ceiling was just add a layer of quarter inch underlayment over the existing sheetrock and re-texture the ceiling.  Great idea and it fixed the ceiling faux paux, but now the ceiling height is a quarter inch lower than normal height.  A quarter inch doesn’t sound like much, except when you have had custom cabinets made to fit the room and now the room is shorter.  As Maxwell Smart said in Get Smart, “Missed it by that much!”  So Mitch has to shave off a quarter inch from the cabinet in order to make it fit.

Another new development, when Mitch measured for the cabinet over the toilet, he measured the outside of the area, not the back of the wall.  Guess what, the back wall is an inch shorter than the front of the wall.  I know, most normal people would assume that the wall should be straight, but not in this house.  Nothing is straight or level, or normal height.  In order to help solve that problem, the sheetrock has to go.  After the sheetrock was pulled off and replaced with quarter inch underlayment, we’re still five eights of an inch short.  So more shaving.

One step forward, two back.  It’s starting to wear on us.  At least we’re still married.

The Gutting of the Bathroom Day 15

Day 15 I had to go to the doctor’s office today for a tetanus shot.  I woke up this morning to a red itchy rash on both arms and put two and two together.  I know it doesn’t sound like the two are linked, but on day one I cut my arm on the house.  I didn’t think much of it at the time, cleaned up the blood and put a band aid on the cut.  For days I carried sheet rock, old boards and other various dirty things to the car dump.  The same thing happened to Mitch last year, that’s the only reason I even thought about it.  About two weeks after he had worked on the exhaust system underneath the El Camino, rolling around in dirt and rust where he scratched up his arms pretty good, he broke out in a red itchy rash and his joints started aching.  He went to the doctor’s office and yes he needed a tetanus shot.  My last one was fourteen years ago, so I was due.

This day turned into one step forward, ten back.  I had ordered lights for the mirrors online and went they arrived, the lights were way too big and had cloth shades.  Nowhere on the web site did it describe the shades as cloth.  Cloth won’t work in a humid environment.  I returned them to the home improvement store and found out I didn’t all of the necessary paperwork.  That meant a trip home to print out some shipping confirmation that had a barcode on it so that the same store that I ordered from could read and then authorize a return.  Isn’t technology great?

Meanwhile, Mitch is diligently trying to measure, cut and lay the underlayment so that he can tile the floor, but things didn’t go so well.  A couple of catastrophes interrupted that.  A flat tire and a tire store that can’t even look at the tire for 2 hours in order to determine if it can be repaired or if a new tire is needed. 

I’m trying to get all of the errands done, take back lights, buy new lights, stain for the cabinets, dirt and tomato plants for the garden, (and get them in the ground) because it’s time to plant.  Oh and don’t forget doctor’s appointment.  All of this and be done and cleaned up in time for a retirement, birthday and welcome home party this afternoon.  Our friends like to multi-task too.

At least we’re still married.

Charlie and Orso Playing While We Work on the Bathroom